Duke Hall Before

Articles in Category: Duke Hall

We recently began the renovation of a 1941 student housing building on Johnson C. Smith University's campus - Duke Hall. This renovation is a gut rehab of the original building that will remove all of the existing plumbing, mechanical and electrical systems, as well as a more current interior building design.
1346269112 rss2 buttons-22

Going on at Duke Hall

on Friday, 13 September 2013. Posted in Duke Hall

Going on at Duke Hall
  • The light pole is down
  • Electrical has passed on the second floor
  • More painting
  • The ceilings in the bathroom started this week
  • Final clean started this week on the third floor
  • HVAC is compete in the crawl space
  • Sealing the crawl space starts Monday
  • Trim outs on the HVAC
  • Trim outs on Electrical
  • Trim outs on Plumbing

Accomplishments at Duke Hall

on Friday, 06 September 2013. Posted in Duke Hall

Accomplishments at Duke Hall
  • Started Chiller
  • Started Sanding Floors
  • Continued Painting
  • Continued Hardware
  • Finished painting 3rd floor
  • Housekeeping 3rd floor
  • Door Hardware
  • More Power turned on

Next Week

  •  Start Bathroom Ceilings
  • Start Fan Coil Units
  • Getting More electrical power turned on
  • More painting
  • More Sanding
  • Vinyl and LVT lower Level